Port Harcourt  /  Lagos

Igniting innovation,
powering infinite possibilities.

Forza Projects is a specialist indigenous company providing fluid power, transfer, and control services to clients across the energy and marine industry.

Forza Projects crew terminating instrumentation on an offshore platform
Forza Projects crew at an onshore wellhead
Forza Projects crew working a wellhead valve offshore

Field operations / Offshore Nigeria

Accredited & certified

ISO 9001:2015
Quality management
ISO/IEC 17025
Laboratory competence
  • ISO 9001:2015 certified
  • ISO/IEC 17025 accredited laboratory

Our readings don’t lie.
Calibrate with us.

You can rely on our calibration for quality control and assurance, from advanced base and mobile laboratories.

  • Certified processes
  • Certified testers
  • Improved reliability
Forza Projects technician in PPE calibrating pressure gauges and instruments on a laboratory bench

Our expertise and integrity has earned the trust of these brands

  • NNPC
  • Oilserv
  • Baker Hughes
  • FIRST E&P
  • TechnipFMC
  • Newcross
  • Shell

We are here for you

Your smooth operation, our priority.

Beyond your specific needs, we keep fleets of built-to-last, versatile equipment ready to meet your requirements both onshore and offshore.

Hire our equipment

Teamwork makes the dream work

Big on people.

We are a people-first company. Our specialist technical and engineering personnel are the core of every job we deliver.

  • Forza Projects Managing Director

    Managing Director

  • Forza Projects Operations Manager

    Operations Manager

  • Forza Projects Safety Officer

    Safety Officer

  • Forza Projects Instrumentation & Calibration

    Instrumentation & Calibration

Selected projects

Trusted on the
jobs that matter.

Over the years, we have collaborated with giants to execute critical projects safely.

  • Valve Installation & Commissioning

    Valve Installation & Commissioning

    Forza Projects led the timely change-out of a 36-inch ball valve controlling the bulk line of the TNP pipeline.

  • Valve Change Out

    Valve Change Out

    Forza Projects led the valve change-out at OML 33, controlling 305 barrels of product every day.

  • Flushing & Pressure Testing

    Flushing & Pressure Testing

    Carried out flushing and pressure testing of the water sprinkler deluge line to ascertain the integrity of the pipe at an LPG storage sphere.

Talk to us

Have a job
in mind?

Send a brief or a data sheet. We come back with scope, lead time, and price.